Friday, May 31, 2019

Apollo 13 (as-508): Houston, We Have A Problem. :: essays research papers

Apollo 13 (AS-508) Houston, we have a problem.The Apollo 13 mission was launched at 213 p.m. EST, April 11, 1970 fromlaunch complex 39A at Kennedy Space Center. The space vehicle crew consisted ofJames A. Lovell, Jr. commander, John L. Swigert, Jr., command module pilot andFred W. Haise, Jr. lunar module pilot.The Apollo 13 Mission was planned as a lunar landing mission but wasaborted en route to the moon after somewhat 56 hours of flight due to loss ofservice module cryogenic atomic number 8 and consequent loss of capability to generateelectrical power, to provide oxygen and to produce water.Spacecraft systems performance was nominal until the fans in cryogenicoxygen tank 2 were turned on at 555318 ground elapsed time (GET). About 2seconds after energizing the fan traffic circle, a short was indicated in the currentfrom fuel cell 3, which was supply power to cryogenic oxygen tank 2 fans.Within several additional seconds, two some other shorted conditions occurred.Electrical shorts in the fan circuit ignited the wire insulation, causingtemperature and pressure to increase within cryogenic oxygen tank 2. Whenpressure reached the cryogenic oxygen tank 2 backing valve full-flow conditionsof 1008 psi, the pressure began decreasing for about 9 seconds, at which timethe relief valve probably reseated, causing the pressure to revive againmomentarily. About a hind end of a second later, a vibration disturbance wasnoted on the command module accelerometers.The next series of events occurred within a fraction of a second betweenthe accelerometer disturbances and the data loss. A tank line burst, because ofheat, in the clean jacket pressurizing the annulus and, in turn, causing theblow-out plug on the vacuum jacket to rupture. Some mechanism in bay 4 combinedwith the oxygen buildup in that bay to cause a rapid pressure rise whichresulted in separation of the outer panel. The panel struck one of the dishes ofthe high-gain antenna. The panel separation shock clo sed the fuel cell 1 and 3oxygen reactant shut-off valves and several propellant and helium isolationvalves in the reaction control system. Data were lost for about 1.8 seconds asthe high-gain antenna switched from narrow beam to blanket(a) beam, because of theantenna being hit and damaged.As a result of these occurrences, the CM was powered down and the LM wasconfigured to supply the necessary power and other consumables.The CSM was powered down at approximately 5840 GET. The surge tank andrepressurization package were isolated with approximately 860 psi residualpressure (approx. 6.5 lbs of oxygen total). The primary water glycol system was

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.